First pile Amsterdam Canal house

EerstePaalBrouwersgracht

Last year the old decrepit buildings still stood, now it is a building site: this morning Waalpaal Foundation Techniques put the first pile for the new building in the ground.

According to an ancient tradition some coins were laid under the piles of the future house, with particular meaning for the clients. For good luck during the building process, and all the years after.

The piles are not driven into the ground, but screwed. The screw injection piles are installed free from vibration and noise. The screw injection pile is a steel tube pile encased in hardened cement grout. During installation the ground is wholly displaced, thereby increasing the bearing capacity. The whole process is barely audible: better for the neighbours.

 

Lees ook:

Living in a green neighbourhood with an urban character in Middelburg

WonenInEenGroeneWijk

In Middelburg, Stevast Baas & Groen and AHH are developing an urban plan with apartments along the water and various types of single-family homes. On Tuesday, March 6 there is an information evening about the plans. You can register on the Veersepoort website.

Twickel College Hengelo no. 1 on list of extraordinary designs

1

Herman Haverkate from Tubantia placed our design for the Twickel College Hengelo first on the list of extraordinary designs that were realised in 2017:

Laurens Jan ten Kate teaches at the University of Navarra

Unav 

On 11 May 2018, Laurens Jan ten Kate from AHH will teach at the Spanish University of Navarra, at the 'Escuela de Arquitectura'.

MFC De Salamander, Arnhem